Assessment of the Performance of Flow
Measurement Instruments and Techniques
The last twenty-five years have seen great
advances in the instrumentation available for hydrometry and in the
procedures and methods for the measurement of discharge. Due to
several reasons, this progress has not seen a parallel development
of guidance material and standards.
At its Twelfth Session (Geneva, October 2004), the
Commission for Hydrology of WMO, having reached a general
consensus that information on the appropriate use of this
instrumentation and methodologies is direly needed, identified under
the priority thematic area "Basic systems (hydrometry and
hydraulics)" an activity to develop a proposal and implement a
project to assess the performance of flow measurement instruments
and techniques against WMO standards.
A small expert team from the Open
Panel of CHy Experts (OPACHE) on Basic Systems has developed a
proposal, which suggests the implementation of a project with the
main objective of making information on standardized test results on
hydrometric instrumentation and measurement methodologies available
to NHSs by providing a Web site as a forum for exchange of
information among interested parties.
An exploratory meeting to further develop the
proposal took place in Geneva from 25-27 April 2007. The final
report and the PowerPoint presentations given during the meeting can
be downloaded here:
As a consequence of the meeting, the original proposal was reviewed and at its thirteenth session (Geneva, 4-12 November 2009), the Commission for Hydrology of WMO, through its
Resolution 2 (CHy-XIII) – Project for the assessment of the performance of flow measurement instruments and techniques decided to continue the implementation of the project and endorsed its proposed Work Plan.
CHy-XIII also decided to establish a Steering Committee for the project, to provide overall guidance, a role which was given to the Advisory Working Group of CHy and a Management Committee for day-to-day implementation. Please find
here the terms of reference of the Management Committee. The first meeting of the Management Committee took place on 18-19 November 2009 in Geneva. The final report of this meeting is available here.
In February 2009, the AWG, on behalf of CHy, decided to adopt the uncertainty analysis framework for flow measurements (developed by the project), based on the Guide to the expression of Uncertainties in Measurements (GUM, 1993). See
here for more information
For comments / suggestions / questions related to
this topic
Please use this
e-mail
or call:
Tel: +4122 7308 407
Fax: +4122 7308 043 |